Cabinets | Kitchen Cabinets | Unfinished Kitchen Cupboards | RTA | Ready to Assemble | Bathroom Vanities | Plantation Shutters


   LOGINPlease log in here Username:  Password:  (-Login Help)  
★ 15% off Mid Continent Cabinetry + free upgrades!! Buy from US Home Products and save on your kitchen!
US Home Products homepage: kitchen cabinets, bathroom cabinets, plantation shutters
For customer service call (888)+684-8362
Live Help

Assembled Kitchen Cabinets Ready to Assemble Cabinets Unfinished Cabinets Bathroom Cabinets Plantation Shutters Cabinet Hardware

Click here to launch Kitchen Planner (Login Required)
Customer Testimonial
I want to thank you again for doing such a great job. You really went the extra mile... or in my case the extra 3... (more)
–Monica K., Kennesaw, GA
Where we have Shipped


Rick D. Kitchen 

Rick D. Kitchen.

In July of 2007 we worked with Rick D in Avondale Estates, GA. He had a really good idea of what he wanted done in his kitchen. We worked with Rick to get him a kitchen that offered conveniences and the look and feel of a kitchen that would cost much more than he spent. Below I have outlined day by day what took place. I think you will see that the transformation was huge. His kitchen is now the nicest room in the house and I am sure that he will spend plenty of time in it.

Here are the details of this job:

1. Cabinets - Brunswick Sienna with Chocolate glaze. All cabinet ends have decorative overlay doors.

2. Granite - Golden Diamond with a OG edge

3. tile back splash - 4" Noche tumbled stone on diagonal with a 4" beige tile insert.

4. Tile floor - 18" x 18" Italian tile in Noche to closely match the back splash.

5. We removed the old pantry and moved the refrigerator to make room for a small breakfast bar.

 

As you can see, the kitchen had builder grade white cabinets. The kitchen was ready for a face lift!

 


 

End of day 1

At the end of day 1 we had removed all of the old cabinets, torn out the original pantry to make room for the refrigerator. Also most of the electrical work was complete. That consisted of new can lights in the kitchen, 2 sconces over the window seat and new outlets.

 

 


End of day 2

 

 

 

 

At the end of day 2 all of the cabinets had been installed and the granite had been measured.

End of Day 3
At the end of day 3 all of the granite was installed and ther floor was completely cleaned to make way for the new tile.

End of Day 4
At the end of day 4, the backsplash was installed and the kitchen was ready for plumbing and a new floor.

End of Day 5
At the end of day 5 the back splash was grouted, the tile floor was in and grouted and the remaining tasks were trim, paint, and appliance installation.

End of Day 6 - job complete
At the end of day 6, the job was complete. The granite, back splash and floor were cleaned and sealed, all trim was painted and any remaining items were completed. I think you can tell that it was a GREAT transformation!
BEFORE AFTER

 

HOME Contact Us About Us Design Tips Terms, Conditions and FAQ ATLANTA Warranty Privacy Policy Site Map Affiliates blog Testimonials

Cheap Kitchen Cabinets Online | RTA Kitchen Cabinets | Ready to Assemble | Unfinished Cabinets | Bathroom Vanities | Plantation Shutters

Marsh Furniture | High Point Cabinetry | Mid Continent Cabinetry


Website: http://www.ushomeproducts.com   -   Phone: 770-783-1998   -    E-mail: matt@ushomeproducts.com
Copyright © 2010 US Home Products - All rights reserved.

click here to verify US Home Products site seals